Pages

Follow wdanang on Twitter

Thursday, June 18, 2009

Scaffolding Material

It can not be denied that the scaffolding is needed in the installation or development related to altitude, the following materials attached to the image of his scaffolding and accessories, i hope more helpful.





Monday, June 8, 2009

RTJ Gasket & Flange Code

this gasket type usually for Pipeline with High pressure.

Set of Scaffolding

One Set Scaffolding [5 Meter Height x 1.05 Meter Width x 4 Meter Length ]. 
Consist of:
1. Steel Tube Standard 1 1/2" x 6 Meter = 10 Length
2. Steel Tube Standard 1 1/2" x 4 Meter = 12 Length
3. Steel Tube Standard 1 1/2" x 1.5 Meter = 18 Length
4. Steel Tube Standard 1 1/2" x 2 Meter = 6 Length
5. Swivel Coupler (for Alternative Design) = 10 Ea
6. Fix Coupler (Right Angle Coupler) = 90 Ea
7. Sleeve Coupler (for Alternative Design) = 10 Ea
8. Beam Coupler (for Alternative Design) = 10 Ea
9. Aluminum Ladder = 1 Ea
10. Base Plate = 6 Ea
11. Aluminum Plank = 5 Sheet
12. Wire Rope Scaffolding = 50 Feet